Next halving
as of Nov 26, 2026, 14:05 UTCAfter the halving
- Block reward
- 1.5625 BTCnow 3.125
- New BTC per day
- ≈ 226now ≈ 453
- Profitable ASICs
- 0 of 155now 11, at $0.10/kWh
Your shutdown price is $69,488 now; after the halving, at today's difficulty, it will be $138,975 — 128% above the current BTC price. In April 2024, the halving likewise raised it from $22,262 to $44,524 in a single day.
ASICs after the halving
Shutdown price at $0.10/kWh, now and after the halving. At the current BTC price ($60,881), 11 of 155 ASICs are profitable now and 0 after the halving.
| № | Model | Now | After the halving |
|---|---|---|---|
| 1 | Antminer S23 XP Hyd600 TH/s · 5,340 W · 8.9 J/TH | Now $45,810margin 25% | $91,621after the halvingneeds +50% |
| 2 | SealMiner A4 Ultra Hydro886 TH/s · 8,372 W · 9.4 J/TH | Now $48,637margin 20% | $97,275after the halvingneeds +60% |
| 3 | Antminer S23 Hyd580 TH/s · 5,510 W · 9.5 J/TH | Now $48,899margin 20% | $97,797after the halvingneeds +61% |
| 4 | Antminer S23 Hyd 3U1,160 TH/s · 11,020 W · 9.5 J/TH | Now $48,899margin 20% | $97,797after the halvingneeds +61% |
| 5 | Bitaxe Naja Duo 12014.4 TH/s · 42 W · 9.5 J/TH | Now $49,133margin 19% | $98,265after the halvingneeds +61% |
| 6 | Antminer S23e Hyd U2h865 TH/s · 8,650 W · 10.0 J/TH | Now $51,472margin 15% | $102,945after the halvingneeds +69% |
| 7 | SealMiner A4 Pro Air336 TH/s · 3,662 W · 10.9 J/TH | Now $56,099margin 8% | $112,197after the halvingneeds +84% |
Your ASIC after the halving
The block reward will be cut in half, so at the same difficulty the shutdown price doubles.
- Shutdown price now
- $69,488
- After the halving
- $138,975
At a BTC price of $60,881, the ASIC already loses money: bitcoin needs to rise 14% now and 128% after the halving.
At a difficulty of 134.82 T. If difficulty grows, the threshold will be higher.
Calculate revenue in the calculatorAll Bitcoin halving dates
- 201250 → 25 BTCNovember 28 · block 210,000difficulty 3.44 M
- 201625 → 12.5 BTCJuly 9 · block 420,000difficulty 213.40 G
- 202012.5 → 6.25 BTCMay 11 · block 630,000difficulty 16.10 T
- 20246.25 → 3.125 BTCApril 20 · block 840,000difficulty 86.39 T
- 20283.125 → 1.5625 BTC≈ April 8 · block 1,050,000difficulty now 134.82 T
Difficulty on the day of the halving. The next date is estimated from the average block time since the previous halving.
Bitcoin halving FAQ
When is the next Bitcoin halving?
Around April 8, 2028, at block 1,050,000: about 499 days, or 72,314 blocks, to go. Nobody knows the exact day in advance: blocks come a bit faster or slower than every 10 minutes. The date is estimated from the average block time since the previous halving — 9 min 57 s — and gets more accurate as the halving approaches.
What is the halving in simple terms?
Cutting the block reward in half. It has been built into Bitcoin from the start and happens every 210,000 blocks — about every four years. This way, the issuance of new coins gradually fades out: there will never be more than 21 million bitcoins.
What will the block reward be?
1.5625 BTC instead of today's 3.125. About 226 new bitcoins a day instead of 453. Transaction fees are not affected by the halving — miners keep receiving them as before.
What will the halving do to mining?
The same ASIC will mine half as many bitcoins while using the same electricity. That is why the shutdown price — the BTC price below which mining no longer pays for power — doubles. At the current price and $0.10/kWh, none of the 155 ASICs stays profitable after the halving.
What happened to the bitcoin price after the last halving?
On the halving day, April 20, 2024, bitcoin cost $64,941, six months later — $68,378, a year later — $85,179. But the halving is not the only thing that moves the price, and nobody knows it in advance.
Why can the threshold after the halving be even higher?
The shutdown price after the halving is calculated here at today's difficulty. And difficulty usually grows: 3.6 times over the last 4 years. If it grows by the halving, the threshold will be higher — you can do your own calculation in the mining calculator.